The Refit Begins 

 

Removing the old tank

        The New tank

 

Removing the port Fuel Tank Long Since abandoned, We are replacing with a stainless steel tanks custom manufactured to fill with the existing fill location and act as 1 tank an electronic fuel gage in the instrument panel.

 

Sea Gnome in her slip with  her new main sail and lazy cradle

  

New stove installed thanksgiving 2005 

Seaward Marine 3174 Stainless Steel Sealed burner Propane stove 

  

New upholstery / Interior with 13" DVD -TV 

Old Interior  

    

Before                                                                            After 

 

The Garage

  

 

 

The Transom and Re Name 

The old Bow Roller 

 

The Bow Roller Removed 

 

The New Bow Roller - A custom made by Garhauer for a Peterson 44 

 

Carlos and Jorge Prepping to install the new bow roller 12/12/05

 

Cutting for 2nd door to have DC panel separate for AC   Panel  

New Electrical panel door  

We plan to have the AC and DC panels separate.  The location of the original electrical panel will be the new AC panel and the controls for the wind generate. behind the nav. station seat where the big hole in a new door and 21 breaker DC panel will be installed .  This wiring mess will be going away and new wiring is being done.  Yeah

 

 

OK Engine room Work

How it was

How it is now

 

Old Wiring on Bulkhead 

 

Stripped Wood

 

Now We just need to add the picture of the wood sparkling

(WE will add these pictures soon)

Top side Paint is next 8/106

Other Upgrades 

Auto Pilot 4/07

Refrigerator 3/07 - Long Beach Marine Installed 

Standing Rigging 9/07

Chain Plates 10/07

New Head Sail roller furling (Furlex 300S) installed 1/5/08

New UK 135% Head Sail ordered 12/21/07 It better be here when we are ready to leave Rick 

Radar installation 1/18/08 - Thanks Louie B for spending so much time up the mast

New Garhauer Dingy Davits and Kayak Rack

I will add pictures when I have a chance , probable while moving the boat to Puerto Vallarta