The Refit Begins
Removing the old tank
The New tank
Removing the port Fuel Tank Long Since abandoned, We are replacing with a stainless steel tanks custom manufactured to fill with the existing fill location and act as 1 tank an electronic fuel gage in the instrument panel.
Sea Gnome in her slip with her new main sail and lazy cradle
New stove installed thanksgiving 2005 Seaward Marine 3174 Stainless Steel Sealed burner Propane stove
New upholstery / Interior with 13" DVD -TV
Old Interior
Before After
The Garage
The Transom and Re Name
The old Bow Roller The Bow Roller Removed
The New Bow Roller - A custom made by Garhauer for a Peterson 44
Carlos and Jorge Prepping to install the new bow roller 12/12/05
Cutting for 2nd door to have DC panel separate for AC Panel
New Electrical panel door
We plan to have the AC and DC panels separate. The location of the original electrical panel will be the new AC panel and the controls for the wind generate. behind the nav. station seat where the big hole in a new door and 21 breaker DC panel will be installed . This wiring mess will be going away and new wiring is being done. Yeah
OK Engine room Work
How it was
How it is now
Old Wiring on Bulkhead
Stripped Wood
Now We just need to add the picture of the wood sparkling (WE will add these pictures soon) Top side Paint is next 8/106 Other Upgrades Auto Pilot 4/07 Refrigerator 3/07 - Long Beach Marine Installed Standing Rigging 9/07 Chain Plates 10/07 New Head Sail roller furling (Furlex 300S) installed 1/5/08 New UK 135% Head Sail ordered 12/21/07 It better be here when we are ready to leave Rick Radar installation 1/18/08 - Thanks Louie B for spending so much time up the mast New Garhauer Dingy Davits and Kayak Rack I will add pictures when I have a chance , probable while moving the boat to Puerto Vallarta |